DIRECTIVE ADM-99
SUBJECT: EMERGENCY REINFORCEMENT DEPLOYMENT (LAST RESORT)
DATE: 2034.07.12 - [RED-ZERO-MARK]
I. BREACH ACKNOWLEDGMENT
Towers 1 through 7 are non-responsive. Sector 7 confirmed "Breached" by Unknown Entity [[Prototype 2.7]]. The digital perimeter has collapsed.
II. THE "SUNDER" PROTOCOL
Tower Central (Analog Command) authorizes the immediate deployment of the Entire Tactical Reserve. Deployment is a ONE-WAY TRANSMISSION. There is no extraction once the analog-to-digital bridge is crossed.
III. MISSION PARAMETERS
- OBJECTIVE: Overlap Pulse Taser fields in "Triangle Formation" to form a shield against projectiles.
- PRIORITY: "Clean the Data, Save the Hardware."
- CONTAINMENT: The Reconstruction Terminal must remain operational at any biological cost. If the Terminal is destroyed, all personnel will undergo TOTAL DATA DELETION.
CENTRAL COMMAND - ANALOG VERIFIED
IV. COMMANDER’S DECLARATION
I, the Dispatcher of Tower Central, acknowledge the digital infrastructure is lost. I authorize the permanent deployment of ASDR Reinforcement Waves to preserve external society.
SIGNED: REDACTED BY UNKNOWN SOLDIERS
DISPATCHER OF TOWER CENTRAL